Client
Xstrata Coal

Contact
Rod Clay – 0418 228 908

Project Value
$6.3 Million

Duration
18 Months

Project Description
Civilbuild were contracted by Xstrata to construct a haul road bridge over the main coal rail line in the Hunter Valley. The bridge was 33m wide to allow the coal haul trucks to pass and was designed to support the loads of an 800 Tonne excavator. The bridge substructure was built under live rail conditions with the girders installed during rail possessions.