Client
NAT Grain

Contact
Martin Mackay

Project Value
$2.6 Million

Duration
8 Months

Project Description
As part of the project for a new grain terminal in Newcastle, Civilbuild was contracted to install the piles and steelwork which would be used to support the ship loader. The piling works involved the supply, driving and welding of 600mm diameter steel tube piles to depths of 45 metres.