Client Contact Project Value Duration Project Description
NAT Grain
Martin Mackay
$2.6 Million
8 Months
As part of the project for a new grain terminal in Newcastle, Civilbuild was contracted to install the piles and steelwork which would be used to support the ship loader. The piling works involved the supply, driving and welding of 600mm diameter steel tube piles to depths of 45 metres.